The Remodeling Project
Back Print Page Email Page

You can see the whole process from beginning to end.



Remodeling

The wall between the nursery and the ladies restroom foyer has been taken out, and a small privacy wall will be built with some blocks from the old wall. The basement walls are going to be re-excavate

| more info |

Remodeling

The old coal chute is about to disappear.

| more info |

Remodeling

Some woodwork around the stairwell is finished up, but the baseboard and molding around the entry way isn't. Now we're waiting to build a 10' by 20' addition on the front of the church for a

| more info |

Roof Replacement, Day 42

The rededication service. Many of those who were most heavily involved were included in the ceremony. Jeff always has insightful perspectives, and shared his thoughts about what the project meant in t

| more info |

Roof Replacement, Day41

Jeff's ill father took a severe turn for the worse today, so the woodwork wasn't finished, but almost everything else was. It took lots of final dusting and cleaning to get everything ready for S

| more info |

Roof Replacement, Day41

Compare the before picture to the after.

| more info |

Roof Replacement, Day41

For all practical purposes, it's done. There is a little baseboard and chair rail to finish up, but that can be taken care of after revival services this week. There is nothing unfinished in what you

| more info |

Roof Replacement, Day 40

If you've been missing the updates, it's because Pastor Daryl went to a couple conventions. Last week it was a Leadership Conference at God's Bible School in Cincinnati with H. B. London of Focus on t

| more info |

Roof Replacement, Day 40

This week it was our Connectional Ministerial with Dr. Bill Ury from Wesley Biblical Seminary, Jacksonville, MS. He's facing the camera on the left. The pastor might look important, but it was only to

| more info |

Roof Replacement, Day 40

The work on the wainscoting still went on. Here's a close-up of the woodwork around the windows.

| more info |

Roof Replacement, Day 40

It still isn't quite finished, but you get the idea of what the songbook rack and shelf will look like. We plan to finish everything this weekend. Join us for the rededication Sunday morning

| more info |

Roof Replacement, Day 29

The wainscoting was started today by Dick and Andrew. An air nailer makes life much easier.

| more info |

Roof Replacement, Day 29

Jim is finally feeling well enough after surgery to help out a little.

| more info |

Roof Replacement, Day 29

Here's how you cut around an outlet with a miter saw. A bunch of closely spaced cuts make it look like the teeth of a comb - then you cut the teeth out.

| more info |

Roof Replacement, Day 29

Here's what's been done so far. About the same amount is done on the other side. The pine boards will be covered with chair rail and baseboard, and are just to save filling unseen spaces with exp

| more info |

Roof Replacement, Day 28

A show of hands revealed that, last Sunday, few people believed we would be back in church this Sunday. But God worked a minor miracle, and it happened. Our first service was with Reflection,

| more info |

Roof Replacement, Day 28

One of their more serious moments. Jessica, Brennan, Mandy, Shane, Jacinda.

| more info |

Roof Replacement, Day 28

It was also a surprise Pastor Appreciation Sunday. The church presented a beautifully done scrapbook with every family's pictures, and a couple pages worth of gift cards. Everyone wanted to look at it

| more info |

Roof Replacement, Day 28

Look! Manna fell from heaven and landed on the pastor's chair!

| more info |

Roof Replacement, Day 27

We began with prayer and breakfast as the men do every Saturday. But there were just as many women as men this time.

| more info |

Roof Replacement, Day 27

All the plywood came off the seats, and Kurly and Emzie help remove all the padding that protected them from damage.

| more info |

Roof Replacement, Day 27

Out with the old...

| more info |

Roof Replacement, Day 27

...in with the new.

| more info |

Roof Replacement, Day 27

Every square inch of the church had to be thoroughly cleaned. Even though the seats were covered and tarps and drop cloths were everywhere, you just can't remodel without making a mess.

| more info |

Roof Replacement, Day 27

Susanna and Christina brought all the hymnals upstairs to fill the new built-in songbook shelves.

| more info |

Roof Replacement, Day 27

Squares of cork were glued into the shadowbox for a bulletin board. Jeff and Steve laid them out as precisely as if they were working on the finest ceramic tile. A craftsman can't do a second rate job

| more info |

Roof Replacement, Day 27

The cleaning crew went above and beyond the call of duty, even using toothbrushes to clean out the scrollwork on the side panels of the seats.

| more info |

Roof Replacement, Day 27

Pressed into service preparing plants for display.

| more info |

Roof Replacement, Day 27

Marilyn goes to great lengths to create lovely decorations.

| more info |

Roof Replacement, Day 27

Here's how it looks so far. We're finally able to use the church again, even though it isn't quite finished. The woodwork has to be done, and the window treatments put back in place, but we can have c

| more info |

Roof Replacement, Day 26

We started in at 6:30 AM to get the painting done in time so everyone could get ready for Family Night tonight.

| more info |

Roof Replacement, Day 26

The electricians came to hang the new light fixtures.

| more info |

Roof Replacement, Day 26

The painting bee. It was all done by a little after noon.

| more info |

Roof Replacement, Day 26

Ashley just happened to be under an overfull roller at just the wrong time. Most of it was already wiped off at this point. It had dripped right down her face.

| more info |

Roof Replacement, Day 26

Obviously the most enjoyable job of the day - hanging the new speakers above the pulpit.

| more info |

Roof Replacement, Day 26

Our monthly Family Night was tonight. We got a few hay rides in between the raindrops.

| more info |

Roof Replacement, Day 26

Jeff gave an object lesson and challenge on reaching for a higher mark.

| more info |

Roof Replacement, Day 26

Just a friendly game of Cut-throat.

| more info |

Roof Replacement, Day 26

Meanwhile, the ladies do what ladies do.

| more info |

Roof Replacement, Day 25

Kenny gets help from Christopher and Daniel in putting up soffet and facia.

| more info |

Roof Replacement, Day 25

Dick can only run the shop vac on one leg for so long before he has to put his foot up so the swelling will go down.

| more info |

Roof Replacement, Day 25

The bucket brigade - a bunch of them needed cleaned.

| more info |

Roof Replacement, Day 25

Painting has finally begun. This is just the primer. The real thing tomorrow.

| more info |

Roof Replacement, Day 25

Old and young get in on the fun.

| more info |

Roof Replacement, Day 25

Herman and Elizabeth (at right) brought supper from the Hot Dog Shoppe.

| more info |

Roof Replacement, Day 25

The big mouths are not all male.

| more info |

Roof Replacement, Day 25

New cables for microphones and monitor speakers were run under the floor. Pastor Daryl solders one of the jacks together to ensure he'll be heard Sunday.

| more info |

Roof Replacement, Day 24

Tim works on the soffet.

| more info |

Roof Replacement, Day 24

Compound is sprayed on the ceiling prior to texturing it.

| more info |

Roof Replacement, Day 24

After spraying, it has to be smoothed with a roller and then stippled. Kind of close quarters back there, isn't it?

| more info |

Roof Replacement, Day 24

Nearing completion.

| more info |

Roof Replacement, Day 24

Two of three groups that went through the community handing out treats for kids with a little card that carried a gospel message. Response was highly positive.

| more info |

Roof Replacement, Day 24

After the compound starts to set up, the tips are flattened with a squeegee, giving it an "orange peel" effect. Very sharp.

| more info |

Roof Replacement, Day 23

The taping is all done on the drywall. Tomorrow the ceiling gets stippled, and an "orange peel" finish.

| more info |

Roof Replacement, Day 23

To keep them out of sight, 5 cables were run through the floor; 3 for microphones and the other 2 for monitor speakers. Those will allow the musicians to hear singers better since the n

| more info |

Roof Replacement, Day 22

Nothing much happened Saturday. Sunday was spent at Jeff & Lisa's again, hopefully for the last time. Today the drywall finishing was back under way.

| more info |

Roof Replacement, Day 22

We also had a group picking out light fixtures and fan/light combos. Here we're inspecting the chandelier we eventually decided on.

| more info |

Roof Replacement, Day 22

Does the color match this one or that one? Or that one? Or that one over there?

| more info |

Roof Replacement, Days 18, 19

Yesterday and today several people spent time at Jeff & Lisa's polyurethaning the woodwork. Cameras were absent or unavailable, but this is the result.

| more info |

Roof Replacement, Day 19

Meanwhile the drywallers finally arrived today.

| more info |

Roof Replacement, Day 19

The drywall hanging was done by 1 PM, and the finishers arrived soon after. It's finally starting to look like an interior.

| more info |

Roof Replacement, Day 19

Jesse has that angelic appearance that comes from working in God's House.

| more info |

Roof Replacement, Day 17

We had a short prayer meeting and then put everyone to work. Several hundred feet of baseboard, trim, and wainscoting were all stained in about 3 hours.

| more info |

Roof Replacement, Day 17

When it was done, it was stacked on scaffolding 6 ft. high and all over the floor.

| more info |

Roof Replacement, Day 16

A few things got overlooked yesterday, so we spent the evening wrapping up loose ends. Some extra insulation was tossed up into the ceiling for extra thickness.

| more info |

Roof Replacement, Day 16

Oops! The shop vac lacked a filter, and made a cloud.

| more info |

Roof Replacement, Day 16

Some of the bigger helpers are the smaller people. Ashley and Susanna help measure boards to place between the studs for nailers for wainscoting.

| more info |

Roof Replacement, Day 16

Ted and Kurly were some who came on short notice to help finish things up.

| more info |

Roof Replacement, Day 15

All this had to go inside. Fortunately, the delivery guys carried most of it.

| more info |

Roof Replacement, Day 15

Kenny prepares aluminum to recover the base of the steeple.

| more info |

Roof Replacement, Day 15

Jonathan helps Jim and Pastor Daryl taper the batting to fit into the eaves.

| more info |

Roof Replacement, Day 15

The old ceiling insulation was laid in the rafters again, and the new pushed up under it, so now there are 15 inches of fiberglass in places. It should be warm this winter.

| more info |

Roof Replacement, Day 15

Dick couldn't get up and down ladders, but he made himself highly useful sitting down and cutting the insulation to size.

| more info |

Roof Replacement, Day 15

Emzie and Marilyn fixed up a delicious supper for the workers.

| more info |

Roof Replacement, Day 15

A big discussion ensued about who had the most persnickety palate.

| more info |

Roof Replacement, Day 15

The insulation is all up and ready for the drywall to be hung. Unfortunately, the crew can't do it till Thursday.

| more info |

Roof Replacement, Day 14

It was too cold outside, so we met for services at the home of Jeff & Lisa. The goodies set out before the morning service were too tempting.

| more info |

Roof Replacement, Day 14

How many churches have decor that includes a trophy elk?

| more info |

Roof Replacement, Day 14

Burt's back is operational again.

| more info |

Roof Replacement, Day 14

The presence of God was rich even though we weren't in a church building. The service lasted an hour and 40 minutes.

| more info |

Roof Replacement, Day 14

Dick joined us although it was difficult.

| more info |

Roof Replacement, Day 14

He also had some rich insights to share that God had shown him this morning.

| more info |

Roof Replacement, Day 14

Fellowship and remodeling discussions after the evening service.

| more info |

Roof Replacement, Day 14

The food and fellowship brought a great Lord's Day to a close.

| more info |

Roof Replacement, Day 13

The pastor's family had to be out of town today, so no pictures were taken of all the volunteers, but here's their handiwork.

| more info |

Roof Replacement, Day 12

Try figuring out this maze of wires. It's a good thing someone can. The electrical work is all done and approved.

| more info |

Roof Replacement, Day 12

The PVC pipe that holds audio and coax cables so they aren't in sight any longer.

| more info |

Roof Replacement, Day 12

It was fun trying to thread the cables through the pipe. Fortunately, there was a "fish tape" on hand to assist, a stiff wire cable that can be pushed through the pipe, and then pu

| more info |

Roof Replacement, Day 11

The electrician was here today to do his thing. He even left flowers and goodies for Pastor Daryl & Marilyn.

| more info |

Roof Replacement, Day 11

So how you like our new lighting?

| more info |

Roof Replacement, Day 11

Deloy Electric's expert employee, Paul.

| more info |

Roof Replacement, Day 11

Canisters for the "eyeball" lights that will provide extra illumination for the platform.

| more info |

Roof Replacement, Day 10

A surprise turnaround - we're suddenly allowed to resume work. We still have to pay for plans, and if anything is deemed unworthy of approval, it has to be ripped out, but at least we're under

| more info |

Roof Replacement, Day 10

Big handfuls to fill the bag.

| more info |

Roof Replacement, Day 10

A good stomp to pack it in.

| more info |

Roof Replacement, Day 10

And it's almost too full to close.

| more info |

Roof Replacement, Day 10

Danny

| more info |

Roof Replacement, Day 10

Shawn - with a little candy.

| more info |

Roof Replacement, Day 10

Ricky

| more info |

Roof Replacement, Day 10

Demonstrating abundant natural talent.

| more info |

Roof Replacement, Day 10

Anna and daughter, Charlene, showed up to change the sign too.

| more info |

Roof Replacement, Day 10

You need to use your head when putting witty wisdom on public display.

| more info |

Roof Replacement, Day 9ff?

Someday it might look like this again. :-) We just found out that the original approval to go ahead with additional renovations inside has been revoked until we come up with architect's drawings we we

| more info |

Roof Replacement, Day 8

The pastor's father-in-law helps nail extra support boards in the rafters.

| more info |

Roof Replacement, Day 8

Another slow day without much to do. Hurricane straps were nailed up, and we missed a picture of Jim applying fire retardant spray to the part of the roof sheeting too close to the property line for t

| more info |

Roof Replacement, Day 7

Since the church is still unusable, we set up chairs in the garage and driveway of one of the houses the church owns. The podium had to go along too.

| more info |

Roof Replacement, Day 7

It wasn't the most picturesque, but it worked.

| more info |

Roof Replacement, Day 7

In fact it was downright ugly, but that didn't hinder the spirit of worship. Both song leaders were sick, on top of everything else.

| more info |

Roof Replacement, Day 7

The chorus books were easier to carry around than the hymnals.

| more info |

Roof Replacement, Day 7

Today was also Life Chain Sunday, so rather than making everyone go home and come right back, we just brought dinner in.

| more info |

Roof Replacement, Day 7

Old and young enjoyed the fellowship.

| more info |

Roof Replacement, Day 7

The food was wonderful, but the friendships are even better.

| more info |

Roof Replacement, Day 7

Praying for our nation and that the destruction of life would cease in the Life Chain.

| more info |

Roof Replacement, Day 7

Danielle

| more info |

Roof Replacement, Day 6

Brennan and Dustin came home from college and got pressed into service.

| more info |

Roof Replacement, Day 6

The stairwell will definitely have a new look.

| more info |

Roof Replacement, Day 6

The new wall will be further from the door, so the floor had to be extended.

| more info |